Planning reference, not a verified GU customer delivery.

Identify the frame diameter, grip and head material of each instrument. Hand drums and tambourines should have separate lines in the equipment schedule.

For a volume order, agree the sample, packing quantity per carton, labels and the procedure for checking the shipment. Do not use a historic regional export figure as evidence of a supplier’s current capacity.